Water Proof Treatment
Caution:
The water prevention sealing for the outdoor jumpers and the
feeder grounding clips of the antenna feeder system is an important
part of the antenna feeder installation. During the installation process,
part of the antenna feeder installation. During the installation process,
must use waterproof tapes properly to ensure the quality of installing
the antenna feeder system.
Connect and seal the 1/2'' jumper and the feeder as follows:
1. Connect and lighten the antenna jumper and the main feeder
connector
2. Make water prevention treatment on the connectors in the
following steps
i. Wrap the waterproof adhesive tapes from a low position
i. Wrap the waterproof adhesive tapes from a low position
where the connector is connected and wrap them about
200 mm to fill in the low-lying parts of the connector, as
shown in Figure 48.
200 mm to fill in the low-lying parts of the connector, as
shown in Figure 48.
F
I G U R E
4 8
W
A T E R P R O O F
A
D H E S I V E
T
A P E
W
R A P P I N G
( 1 )
ii. Extend the adhesive tapes to double their length when
wrapping them. The direction of wrapping must be the
same as the direction of screwing the feeder connector,
in case that the feeder connector may be loosened during
the wrapping process.
same as the direction of screwing the feeder connector,
in case that the feeder connector may be loosened during
the wrapping process.
iii. As shown in Figure 49, wrap the adhesive tapes layer by
layer and then wrap them again in the reverse direction.
The upper layer must cover the lower layer by about 1/3
to avoid water penetration. Finally, wrap them layer by
layer again in the reverse direction. Wrap the tape with
three layers without any cut in the entire process. Wrap
the tapes around the feeder connector till they protrude
about 20 mm from the feeder connector.
The upper layer must cover the lower layer by about 1/3
to avoid water penetration. Finally, wrap them layer by
layer again in the reverse direction. Wrap the tape with
three layers without any cut in the entire process. Wrap
the tapes around the feeder connector till they protrude
about 20 mm from the feeder connector.