Hewlett Packard Enterprise Company APEX0102 User Manual

Page of 20
14
AP-277 Outdoor Access Point
| Installation Guide
Use of the CKIT-OD-AC-P
Assembly instructions for this part are shipped with the part. All instructions must be followed to 
ensure proper assembly of the connector onto the cable.
The required specifications for third party cable used with the CKIT solution are as follows:
AC power cable specifications (when using AC connector kit and custom cable): minimum voltage/
current rating 250V/1A, diameter 6-12mm, rated for outdoor use and UV exposure
AC Power Cable Connector PIN OUT 
Figure 16  
AC power cable connector 
Connecting the Power Cable to the AP
1. Remove the weatherproof cap on the power interface. 
2. Insert the power cable connector into the power interface and hand-fasten the locknut. 
Verifying Post-Installation Connectivity
The integrated LEDs on the AP can be used to verify that the AP is receiving power and initializing 
successfully (see 
and 
). Refer to the ArubaOS Quick Start Guide for further details on 
verifying post-installation network connectivity.
Configuring the AP
AP Provisioning/Reprovisioning
Provisioning parameters are unique to each AP. These local AP parameters are initially configured on 
the controller which are then pushed out to the AP and stored on the AP itself. Aruba recommends 
that provisioning settings be configured via the ArubaOS Web UI only. Refer to the ArubaOS User 
Guide for complete details.
AP Configuration
Configuration parameters are network or controller specific and are configured and stored on the 
controller. Network configuration settings are pushed out to the AP(s) but remain stored on the 
controller.
Configuration settings can be configured via the ArubaOS Web UI or ArubaOS CLI. Refer to the 
ArubaOS User Guide for complete details.
 Hot
Neutral
Ground