4 Installation 
4.1  Recommendations before Installation 
4.1.1  Wire Feed Sheaths 
Within  the  framework  installation  you  need  at  least  a  power  supply  cable  sheath  and  an 
Ethernet cable sheath to connect to the Ethernet network. These sheathed cables will be located at 
the bottom center of the pedestal as shown in 
Figure 8
If needed according to the installation configuration, extra sheathed cables need to placed 
for  wire  synchronization,  Trigger  cable  and  to  remotely  switch  the  RF  on  &  off  and  I/O  cables  to 
drive external devices (Camera, Remote alarms…).  
The L-SP3 is delivered without any IEC terminated plug power supply cable or Telecommunication 
cable.  It is up to the Local installation personnel to use the appropriate IEC Power Cord according 
to local electrical regulations. 
 
 
 
 
 
 
 
 
 
Use  appropriate  IEC  power  cord  according  to  the  local  regulations  to 
power up and interconnect the pedestals. 
 
The Power Supply Cord is the LSP3 Product Main Disconnecting Device, 
It  should  be  easily  accessible  at  any  time  to  Disconnect  the  pedestals 
from the mains power supply.