Tagsys S.A. LSP3STANDARD User Manual

Page of 63
 
May 2009 
Revision 0.2 
25/63 
Figure 8: Pedestal Mounting Base Dimensions 
 
1.  Identify and mark the location of the holes to be drilled for mounting the pedestal to the ground. 
The use of a tape measure and a square is recommended. 
2.  Drill the cable access and mounting holes according to the type of ground surface: 
a.  Wooden  floor:  Drill  eight  holes  with  a  diameter  of  4  mm  for  the  mounting  screws  and 
one hole with a diameter of 19 mm for the cable access.  
b.  Cement floor: Drill eight holes with a diameter of 8 mm for the cement floor plugs and 
one hole with a diameter of 19 mm for the cable access. It may be necessary to provide 
a groove for the power supply cable connected to the L-SP3 Electronics Unit. Insert the 
concrete floor plugs into the mounting holes. 
3.  Remove the pedestal from the box. 
4.  Remove the plastic cover from the both sides after removing the 4 fixing screws. 
Figure 9: L-SP3 Bottom Plastic Cover (4 screws Circled) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
CAUTION:  Always  use  a  protective  sleeve  for  main  power  cable,  which 
match to the flammability grade of the product. Mains power cable must 
be  a  3  wire  (line,  neutral  and  earth),  multi  stranded  copper  wire, 
minimum section of 0.75 mm²/ 3A)