Tagsys S.A. LSP3STANDARD User Manual

Page of 63
 
Library Security Pedestal 3 
 
38/63 
Revision 0.2 
May 2009 
 
 
 
 
Modifying TCP/IP configuration (including port) 
Fill the fields with the appropriate values and click “Apply Changes”. You can then decide to apply 
the new TCP/IP configuration immediately by rebooting the pedestal, or to wait for next reboot to 
apply it. 
5.4.4  Monitoring Pedestal Activity 
 
Figure 17: Pedestal Monitoring Tab 
 
 
When upgrading both System and Radio firmware, it is advised to reboot 
the pedestal only once after both upgrades are completed. 
 
The EAS detection is suspended during the upgrade process. 
 
Do not power-off pedestal during the upgrade process. Failure to respect 
this procedure may corrupt pedestal firmware and require product to be 
sent back to TAGSYS. 
 
In case of a software failure during the upgrade process, do not power-
off the pedestal, restart the configuration software and try upgrading the 
pedestal again.