Kohler KOHLER006 User Manual

Page of 20
JOBNAME: No Job Name PAGE: 3 SESS: 17 OUTPUT: Wed Jun 23 13:46:00 2010
Before You Begin (cont.)
CAUTION: Risk of hazardous gases.
If a new toilet is not installed immediately, temporarily place
a rag in the floor flange opening.
NOTICE: Follow all local plumbing and electrical codes.
IMPORTANT!
For ease of installation, install the docking station power cord before the sub wall and
finished wall are installed.
Observe all local plumbing and building codes.
Carefully inspect the new toilet for damage.
Consult the online users guide at kohler.com for more information.
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.
Kohler Co.
3
1132336-2-A