Davis Instruments DWW6357 User Manual

Page of 21
2
Hardware
The following hardware is included with the Vantage Vue ISS weather station 
assembly. Some of the hardware is optional based on how the ISS is assembled and 
installed. (See “Installing the ISS” on page 10 for more information.)
Note: 
If any of the hardware components are missing or not included, contact Customer Service toll free at 1-
800-678-3669 about receiving replacement hardware or other components. 
Tools for Setup
The following are additional tools required to set up and install the ISS:
• Adjustable wrench or 7/16" wrench
• Compass or local area map
Preparing the ISS for Installation
Please follow the steps in the order in which they are presented. Each step builds on 
tasks completed in previous steps. 
Note: 
Davis Instruments recommends that you use a clean, well-lit work table or work area to prepare the ISS 
for installation.
The steps to prepare the ISS for installation are:
• Attaching the wind cups to the anemometer
• Mounting the wind vane
• Installing the debris screen
• Installing the rain collector tipping spoon assembly
• Installing the ISS battery and testing communication with the Vantage Vue con-
sole
• Changing the Transmitter ID for wireless communication, if necessary
1/4" Flat Washers
1/4" Lock Washers
1/4" Hex Nuts
3-Volt
Lithium 
Battery
U-Bolt
Backing Plate
0.05" Allen 
Wrench
8" Cable Tie