Tait International Limited TBCH3B User Manual

Page of 32
 
TB9400 Installation and Operation Manual
Installation
77
© Tait Limited July 2017
4.6.7
Connecting a 1PPS Source
A 1PPS signal is required for simulcast and P25 Phase 2 base stations. Use 
a 50
: coaxial cable (RG58 or RG223) to connect the source to the base 
station’s 1PPS input. You can daisy-chain up to eight base stations using 
F-junctions. We recommend that the cable length between the first and last 
load is kept to a minimum. This will reduce any propagation variation 
between base stations. The maximum overall cable length is 30m. 
Terminate the last connection (including single base stations) with a 50
resistor, otherwise reflections of the 1PPS pulse may occur. 
Notice For P25 Phase 2 operation the NTP signal must be linked to 
the 1PPS signal. To ensure synchronization, both signals must come 
from a source that is GPS-disciplined.
4.6.8
Ethernet Connection
The RJ-45 socket on the reciter’s rear panel provides the 1-BASE-T or 
100BASE-T Ethernet connection to the other devices in the network. Use 
a Cat-5 cable to connect this socket to the Tait Network via a router or 
switch.
The Web UI allows you to set the Ethernet port speed auto-negotiation to 
10/100 Mbit/s or to negotiate a maximum 10 Mbit/s. Tait recommends that 
you keep the port speed at the factory default setting of 10 Mbit/s. The 
reciter hardware and software are scaled to meet the performance 
requirements of processing multiple voice streams along with supervisory 
control and management communications. 10 Mbit/s is ample for those 
requirements. The 10/100 Mbit/s setting is provided for compatibility 
reasons, but it is possible under high traffic conditions at 100 Mbit/s for 
traffic arriving at the reciter at the full rate within a small timing window 
Figure 4.12 Daisy-chaining a 1PPS input
The longest length of cable must be between 
the source and the first base station
use short lengths of cable 
between each base station
maximum of eight base station 
loads on one 1PPS output
50
: termination
(also needed for
single base stations)