UTC Fire & Security Americas Corporation Inc 801-IXT User Manual

Page of 58
Chapter 5
Testing
39
Testing communication 
Test communication between your system and the central monitoring station or a voice report destination at 
least once per week to make sure you have the proper telephone connection.
Note:  
The system must be in disarm mode.
To perform a communication test:
1. Scroll to System Tests
2. Press Enter. The display shows Enter Code.
3. Enter the master code.
4. Press Enter to accept the master code. The display shows Comm Test
5. Scroll to Comm Test
6. Press Enter. The display shows Comm Test is On.    
7. After the communication test is successful, the display shows Comm Test Ok
8. Press STATUS repeatedly to exit.
Note:  
If your system is not connected to a central monitoring station and you do not have a voice report destination 
programmed, you won’t be able to perform the communication test.
If the communication test is successful, the system displays Comm Test Ok. If the test is unsuccessful, the 
STATUS button will light and within ten minutes the panel will display Comm Failure. If a communication 
test fails, call your security system dealer.