Andrew Wireless Innovations Group BCEL-DUALBAND User Manual

Page of 18
Rel 00 08/04/98                         
BriteCell Dual Band Operative and maintenance Handbook
Tekmar Sistemi S.r.l. keeps the right of any change or improvement without prior notice.
 
Pag.14/15
8.  
INSTALLATION HINTS
8.1  
INSTALLATION OF LOCAL INTERFACE
Installation of Local Interface is as per standard rules related to fixed base equipment.
IMPORTANT: prior to remove or insert any module make sure that power supply is off
8.2  
INSTALLATION OF REMOTE RF OPTICAL TRANSCEIVER
Installation of Remote RF optical Transceivers must be carried effect taking care that the units are
at least 2.5 m above the walking floor; while choosing their position, please remember that
mobiles should not come too close to the antenna.
The unit is intended to be installed on walls, flat or orthogonal; an additional bracket is included to
provide this last possibility.
The installation must provide the correct UP positioning, and cables must be laid so that
accidental damage is prevented.
9. POWER LEVELS
The following table shows BriteCell downlink maximum input and output power as a function of
the number of carriers being used.