CBF Networks Inc. dba Fastback Networks 105 User Manual

Page of 38
IBR Installation Guide
 
 
Page 8 of 38 
Doc # 770-00023.1 
 
 
Jan. 23, 2015 
 
2. 
Getting Started 
2.1  Physical Inspection 
Prior to opening the shipping crate, inspect it visually for evidence that it has been opened or mishandled.  
After opening the crate, carefully inspect the contents for completeness or evidence of damage or tampering. 
In the event the shipping crate is damaged or the contents are damaged or incomplete, notify Fastback 
Networks by telephone, fax, or email.  The shipping crate, dividers, and packing materials should be retained 
for use in the event that equipment must be returned to Fastback Networks. 
After removing IBR from its packing crate, record the serial number and product number (e.g., 75JP or 57JP), 
both of which will be needed in case it is necessary to seek assistance from Fastback Network’s Customer 
Support Group.
 
DO NOT OPEN IBR FOR ANY REASON.  DOING SO WILL VOID THE WARRANTY AND MIGHT CREATE A 
SAFETY HAZARD AND/OR CAUSE THE EQUIPMENT TO BE OUT OF COMPLIANCE WITH REGULATIONS. 
DO NOT ATTEMPT TO APPLY POWER TO AN IBR THAT SHOWS SIGNS OF DAMAGE, TAMPERING, OR 
MISHANDLING. 
2.2  Inventory 
The following components are required for successful installation of a link: 
a.  One IBR101 and one IBR102, each of which includes the following: 
 
Three weatherproof RJ-45 cable-end connectors for CAT5E & CAT6 cables
*
 
A weatherproof cap for the four-pin serial connector that is attached to IBR when the IBR serial 
connector is not in use*. 
 
Two weatherproof caps for RJ-45 connectors that are attached to IBR when the IBR RJ-45 connectors 
are not in use*. 
 
A two-meter serial cable with a DB-9 connector on one end and a four-pin connector on the other 
end;