15
4. Work flow
For use of Leak Nets, the actual workflow is shown below. See the relevant section for operation necessary for
each work.
4-1 Monitoring of pipeline
Work plan
Preliminary inspection of field site
Initial setting
(Initial registration of logger, ID setting (arbitrary setting))  Recommended to perform only for initial setting or
immediately after formatting the card.
Check of device operation in the test mode (See Page 31.)
Setting of logger (See Page 23 to 28.)
Loggers to be set are registered on the data collection screen. (Arbitrary)
Setting the loggers on the monitoring spots
Collection appointment on the data collection screen (Arbitrary)
(See Page 20.)
* This can be performed only for the loggers the IDs of which are displayed on the collection screen.
Data collection (See Page 20.)
Transfer of data from analyzer to PC (See Page 33.)
Analysis by PC (See Page 103 to 114.)
Selection of pipeline
Confirmation survey
Making of report