6.5.1.2 
Low Band Sub-system Shutdown 
 
The Combined DRU LB sub-system should be shut down in the following sequence: 
 
1.  Using the LBE GUI, set SysOperatingMode to standby. 
o
 
The LBE GUI Cpl1ForwardPwr reading should decrease by 3 dB. 
o
 
The LB HPA LED will be illuminated blue. 
o
 
The TRMS LB Status LED will be extinguished. 
2.  Switch OFF the LB HPA PSU circuit breaker (CB1, CB2, CB3 and CB4), located on the 
LB cabinet PDU. 
o
 
The Norm LED’s on the LB HPA PSU’s (PS 1, PS2, PS3 and PS4) will be 
extinguished. 
o
 
The front panel LED’s on the LB HPA’s (HPA 1, HPA 2, HPA 3 and HPA 4) will flash 
green and red alternately. 
3.  Switch OFF the TSC-L 5A circuit breaker, located on the BMS front panel. 
o
 
The LED’s on the LB HPA’s will be extinguished. 
4.  Switch OFF the LBE 25A circuit breaker, located on the BMS front panel. 
o
 
The LBE Power LED will be extinguished and the internal fan will turn off. 
5.  Switch OFF FAN 1 / FAN 2 (CB 9) and the FAN 3 / FAN 4 (CB10) circuit breakers, 
located on the LB cabinet PDU. 
o
 
The HPA compartment fans will turn off (fans cannot be heard) and that the PDU 
FAN 1 and 2 LEDs will be extinguished. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
SX03-20000-01-M01 6-6