Unique Broadband Systems Ltd. DRU1KW User Manual

Page of 176
 
 Chapter 
Installation 
 
  The  repeater  cabinets  should  be  positioned  within  the  room  to  allow  for  adequate 
ventilation. 
  Sufficient space must be made available in front of the cabinets so that the front doors 
to be opened and closed, allowing the installer to access the PDU, BMS, LNA, DBPF, 
LBE, HBE, TRMS, dial-up modem, HPA’s and HPA PSU. 
  Sufficient space must be made available behind the cabinets so that the rear doors can 
be opened and closed, allowing the installer to access the 12 VDC battery and 
component rear panel interfaces (connectors). 
  Sufficient space must be made available on the left side of the HB cabinet and right 
side of the LB cabinet, allowing for cable connections to surge protectors as well as 
routing ground, AC, communications and alarm wires/cables into the cabinet. 
  Sufficient space must be made available above the cabinets for the removal or 
installation of the cabinet hood, permitting the installer to access the fan box. 
 
 
3.6.4 
Unpacking 
 
Inspect all crates and boxes for exterior damage and make note of any dents, broken seals, 
or other indications of improper handling.  In the event any in transit damage is discovered, 
report it to UBS. 
 
Remove the repeater cabinets and components (assemblies) from their crates and boxes.  
Verify that all materials are enclosed as listed on the packing slip and report any shortages 
to UBS. 
 
Open the front and rear doors on the repeater cabinets and inspect the interior for packing 
material and carefully remove any material that is found.  Do not remove any labeling or tags 
from the cabinets, drawers/modules, wires/cables or connectors; these are identification 
markers that make assembly of the repeater system much easier. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
SX03-20000-01-M01 3-12