Baicells Technologies Co. Ltd. BRU3501 User Manual

Page of 29
Nova-243 Outdoor LTE TDD Base Station Installation Guide 
 
training, and having the corresponding qualifications. 
 
Against Lightening and Grounding Protection 
2.5
CAUTION
It  is  unlikely  to  happen  but  since  the  LTE  base  station  is  very  sophisticated 
equipment  so  we  would  recommend  you  to  test  it  on  the  ground  to  make  sure 
everything is functioning before install on the tower. 
The  operator  must  prepare  external  against  lightning  protector  to  protect  the  GPS, 
external antenna and RJ-45 port. 
Grounding Notes: 
 
The ground wire adopts yellow-green wire that is no smaller than 16 mm². 
 
Grounding principle: as near as possible. 
 
The base station connects to the reliable outdoor grounding point (earth) through 
one ground screw. 
 
The  connection  of  the  grounding  points  and  the  ground  bar  need  to  be  tight  and 
reliable. Rustproofing the terminals is required. This can be done with rust preventing 
paint, anti-oxidation coatings, grease, etc. 
 
Weatherproof Protection 
2.6
The  Nova-243 adopts  cold shrink tube for weatherproof protection. Before installing 
the cold shrink tube,  clean up the  interface first. The  weatherproof  protection  steps 
are as follows: 
1.  Insert cable into cold shrink tube. 
2.  Tighten the connector. 
3.  Push the cold shrink tube to the top joint and pull out the strip. 
4.  Check whether the cold shrink tube tight connect with the connection.