Valeport Ltd 0804IDU User Manual
HydrINS 2 / HydrINS 2 Mini flow meter
Installation Manual
Page 38 / 83
8.4 Closing the display lids
Follow the instructions below to close the lids of display units (A,C,E and G)
1. Put the first lid in place by pushing "A" point then "B" point", hold in place then screw points
1 and 2 at 0.85 Nm.
2. Put the second lid in place by pushing "C" point then "D" point, hold in place then screw
points 3,4,5, and 6 at 0.85Nm.