AMD Sempron™ Processor-In-a-Box 2600+ SDA2600BOX User Manual

Product codes
SDA2600BOX
Page of 102
16
Power Management
Chapter 4
AMD Sempron™ Processor Model 10 Data Sheet
31993A-1 September 2004
AMD Preliminary Information
Connect State 
Diagram
Figure 6 below and Figure 7 on page 17 show the Northbridge 
and processor connect state diagrams, respectively.
.
Figure 6.   Northbridge Connect State Diagram
Condition
1 A disconnect is requested and probes are still pending.
2 A disconnect is requested and no probes are pending.
3 A Connect special cycle from the processor.
4 No probes are pending.
5 PROCRDY is deasserted.
6 A probe needs service.
7 PROCRDY is asserted.
8
Three SYSCLK periods after CLKFWDRST is deasserted. 
Although reconnected to the system interface, the 
Northbridge must not issue any non-NOP SysDC 
commands for a minimum of four SYSCLK periods after 
deasserting CLKFWDRST.
Action
A
Deassert CONNECT eight SYSCLK periods 
after last SysDC sent.
B Assert  CLKFWDRST.
C Assert CONNECT.
D Deassert CLKFWDRST.