78-19803-02 Cisco TelePresence System T3 System Assembly Guide, December 2011
Where to put cable
bundling kits A &
1–3
bundling kits A &
1–3
2
1
1
3
3
2
1
A
A
(2 cables)
A
A
(2 cables)
Floor Structure
B
B
B
B
When cabling and levelling the system you may want to
fully open the centre bottom module lid.
Note that you may either open the center module lid or
both the left & right module lids fully at a time. All three lids
cannot stay fully opened simultaneously.
fully open the centre bottom module lid.
Note that you may either open the center module lid or
both the left & right module lids fully at a time. All three lids
cannot stay fully opened simultaneously.
Caution!
If you choose to fully open any of the lids, make sure you put a soft cloth or similar underneath the lid to avoid scratches.
Tip!
These cables are country-specific
These cables are country-specific
Caution!
No cables must be put so that they end
up between the floor structure and the
door—they must all enter the system
entirely underneath the floor structure.
Otherwise the door will not close properly.
Note!
All cables going from the left
part towards the wall will reside under
the same cover. There is one cover for
the left side and on for the right side.
the same cover. There is one cover for
the left side and on for the right side.