Cisco T3 kit CAB-T3-KIT6= User Manual

Product codes
CAB-T3-KIT6=
Page of 28
Page 15 of 28
78-19803-02 Cisco TelePresence System T3 System Assembly Guide, December  2011
Where to put cable 
bundling kits A & 
1–3 
2
1
1
3
3
2
1
A
A
(2 cables)
A
A
(2 cables)
Floor Structure
B
B
B
B
When cabling and levelling the system you may want to 
fully open the centre bottom module lid. 
Note that you may either open the center module lid or 
both the left & right module lids fully at a time. All three lids 
cannot stay fully opened simultaneously.
Caution!
 If you choose to fully open any of the lids, make sure you put a soft cloth or similar underneath the lid to avoid scratches.
Tip!
 
These cables are country-specific
These cables are country-specific
Caution!
 
No cables must be put so that they end 
up between the floor structure and the 
door—they must all enter the system 
entirely underneath the floor structure. 
Otherwise the door will not close properly.
Note!
 All cables going from the left 
part towards the wall will reside under 
the same cover. There is one cover for 
the left side and on for the right side.