BlueWalker 10120533 User Manual

Page of 224
 
 
EN 
Connecting multiple EBMs in Tower form 
1. Connect Earth line between UPS and the first EBM, and then connect Earth 
Line between the first EBM and the second EBM. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2. Take off the front panel, and connect the battery terminal (A) from UPS to 
EBM terminal (B) shown as below. And then connect the battery terminal (D) 
from the first EBM to the battery terminal (E) from the second EBM. Users 
need to remove the small gate(C) on side of the front panel to allow the 
outlet wire of the EBM to pass through the gate and then reassemble front 
panel. 
 
 
 
 
 
 
 
 
 
 
 
 
B
C
A
D
E