Transition Networks MIL-SM2401MAF User Manual

Page of 178
 
                                                                               
 
11
 
with the smaller bracket screws. Then attach the remaining bracket to the other side 
of the Switch. 
B.  After attached both mounting brackets, position the 24 10/100TX plus 2 SFP/Copper 
managed  POE  switch  in  the  rack  by  lining  up  the  holes  in  the  brackets  with  the 
appropriate holes on the rack. Secure the switch to the rack with a screwdriver and 
the rack-mounting screws. 
 
[Note] For proper ventilation, allow about at least 4 inches (10 cm) of clearance on the front and 3.4 
inches (8 cm) on the back of the Switch. This is especially important for enclosed rack installation. 
 
 
Power On   
 
Connect the power cord to the power socket on the rear panel of the Switch. The other 
side of power cord connects to the power outlet. The internal power supply of the Switch 
works with voltage range of AC in the 100-240VAC, frequency 50~60Hz. Check the power 
indicator on the front panel to see if power is properly supplied.