Huawei S3700-52P-PWR-SI 02354132 Quick Setup Guide
Product codes
02354132
4.1 Checking Before Power-on
After hardware installation is complete, you need to check the device installation and cable
installation.
installation.
NOTE
Before power-on, you need to check the device cabinet, cables, connectors, sockets, labels, and on-site
environment.
environment.
Device Installation Checklist
CAUTION
Before power-on, all the power distribution cabinets and power distribution frames must be off.
Table 4-1 Device installation checklist
No.
Item
Method
1
The cabinet is installed according to the
dimensions on the design paper.
dimensions on the design paper.
Check the cabinet according to the
project design document.
project design document.
2
The expansion bolts for fixing the
cabinet or base (support) to the ground
are fastened. The plain washer, spring
washer, and nut (bolt) are installed
correctly.
cabinet or base (support) to the ground
are fastened. The plain washer, spring
washer, and nut (bolt) are installed
correctly.
-
S2700&S3700 Series Ethernet Switches
Quick Start
Quick Start
4 Powering on the Device
Issue 01 (2012-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
24