Intel SC5299WS User Manual

Page of 154
Power Sub-system 
Intel
®
 Entry Server Chassis SC5299-E TPS 
  
Revision 
3.1 
Intel order number D37594-005 
84 
 
Notes: 
1. All dimensions are in mm. 
2. All tolerances are +15 mm/-0 mm 
3. Install 1 tie wrap within 12mm of the power supply cage. 
4. Mark reference designator on each connector. 
5. Tie wrap each harness at approximately mid point. 
 
 
Figure 18. Output Harness for 670-W Power Supply