Avaya Integral 5 Easy BND AR2.X 4999108490 User Manual

Product codes
4999108490
Page of 254
Installation manual Integral 5 D/E easy
PB1 (emergency power supply)
06/07
139
4.999.112.593
Switching off the supply voltage (to BNx or IP module)
Battery/accumulator change
  
Switching off the Integral 5 easy
Proceed as follows to switch off the supply voltage to the BUx or EUx or IP module: 
Variant 1:
 Open the battery cover and unplug the battery plug (from all PB1 modules)
 
 Then unplug the plug-in mains units or switch off the multi-socket extension
 
 After reconnecting the mains supply, plug in the battery plugs again
Variant 2:
(only if there is only 1 x PB1 in the system) 
 First unplug the plug-in mains units or switch off the multi-socket extension from the socket, or switch off
 
    the main supply.
 
 Press button for approx. 6 sec. (release in area 2) ---> the power supply to the BUx or EUx or IP module will
 
    be switched off.
 
 Check whether the LED is really unlit.
 
 
 To switch the system back on, insert the plug-in mains unit back into the socket. 
 Never remove the supplied, coded SV cable between PB1 and BNx or EXE or IP module during operation! 
 Always carry out procedure for switching off! Never unplug or insert a live IOM or LAN extension cable!
Battery/accumulator change
Changing NiCd battery (accumulator):
Withdraw the flat plug (3) (of battery)
 
Remove the rechargeable battery from its holder