Avaya Integral 5 Easy BND AR2.X 4999108491 User Manual

Product codes
4999108491
Page of 254
Installation manual Integral 5 D/E easy
Installation examples I5 E easy
06/07
219
4.999.112.593
Explanation of example 4
The BNE is connected to the first two EXE by LAN, so the 4 LAN S8D plug-in modules can also be driven from the EXE. The enables 16 RBS connections. 
All further RBS connections must be achieved using IOM plug-in modules, 3 x EXE on BNE and 1 x EXE on BNS.
The rule here for DECT is:
An additional rule applies:
In the upper diagram the maximum DECT expansion has been selected; other permutations can be found in the "Summary of items for fitting to BND/EXE".
All modules must be earthed. 
Max. 32 x RBS are permissible within the system (in the example there are 32 x RBS).
 
No S8D modules are permitted on the BNE and BNS control modules.
One module with DECT module(s) requires its own power supply.
Only are where the connections of the EXE purely analog is a singleton IOM connection BND-EXE permissible.
 
Except where the connections of the EXE are purely analog2 IOM connections should always be made from the BND 
 
to the EXE.