Hitachi RAF-35RPA RAF35RPA User Manual

Product codes
RAF35RPA
Page of 706
 
10-25 
 
2.  Opening on ceiling and suspension bolt position 
• 
Indoor unit 
 
FRONT VIEW 
 
SIDE VIEW 
• 
Chamber of suction grille 
 
PLANE VIEW 
 
FRONT VIEW 
 
SIDE VIEW 
 
 
• 
Chamber of discharge grille 
 
 
FRONT VIEW 
 
SIDE VIEW 
 
PLANE VIEW 
• 
Arrange drain pipe, refrigerant pipe and 
connecting cord in their installation position. 
• 
For finishing of opening on ceiling, arrange with 
builder in detail 
3.  Installation of suspension bolt 
• 
Be sure to reinforce furring of ceiling (frame: 
ceiling joint and supporter) to maintain level of 
ceiling and prevent vibration of ceiling plate. 
• 
Suspension bolts should be purchased in the field 
• 
Refer to diagrams shown below or length of 
suspension bolts. 
• 
In case of wooden frame 
 
 
 
790 
750 
330 
210 
75 
Abover 300 
Abover 300 
A
b
o
ver
 30
Suspension bolt 
(M10: local purchase) 
54 
150 
400 
205 
54 
28 
347 
Suspension bolt 
(M10: Local purchase) 
186
 
235
 
194
 
58
 
274
 
206
 
Opening on ceiling 960 
Suspension bolt 793 
132 
35 
Ope
nin
g o
n c
eiling
 2
33
 
116.
Gr
ille
 
253
 
10
 
10
 
Grille 980 
229 
300 
Suspension bolt 
position 793 
Opening on ceiling 960 
Suspension bolt 793 
Grille 980 
Suspension bolt 
position 793 
116.
Ope
nin
g o
n c
eiling
 2
33
 
Gr
ille
 
253
 
10
 
10
 
132 
300 
229 
262
 
186
 
56
 
253 
Above 300 
Above 300 
860 
199 
310 
Reinforcement 
A
b
o
ve 330
 
47
 
98
 
Suspension bolt 
(M10: Local
 
purchase)
 
Ceiling 
Above 200 
110 
47
 
270
 
178
 
Opening on ceiling 
Suspension bolt 
position 740 
53 
740 
53 
48
 
96
 
60~90mm square piece of lumber 
Nut 
Angle 
Angle 
Nut 
Suspension 
bolt M10 
About 130 
Ceiling 
740