Hitachi RAF-35RPA RAF35RPA User Manual

Product codes
RAF35RPA
Page of 706
 
10-40
 
 
• 
Connect the motor connector of discharge duct to 
the connector CN8 (see diagram below) 
• 
Attach connector of this panel of the connector 
CN11A on the control PWB> 
 
10.  Setting of external static-pressure switch 
• 
Remove lid of electric box and set the “STATIC 
PRESSURE” switch. 
 
HIGH       : 80Pa 
NORMAL : 50Pa 
LOW        : 30Pa 
• 
If not set to HIGH STATIC-PRESSURE, there will 
be reduction of cooling and heating capacities. (At 
the time of delivery, the switch is set to “NORMAL”) 
11.  When connecting the H-Link 
• 
When connecting to H-link, a separately purchased 
RAC adaptor is required. 
• 
To install the wiring, the electrical box cover must 
be opened. 
• 
Connect the RAC adaptor to CN1101. 
• 
The connection cord and power cables are to be 
arranged and tied up as per the diagram as shown 
below. 
• 
Please refer to the respective user manuals of the 
RAC adaptor, for further details. 
 
12.  Protection of lead wire 
• 
Wrap aluminum tape around PVC tube between 
electric box and indoor unit (cord band). 
 
13.  Operation test 
• 
Please ensure that the air conditioners in normal 
operating condition during the operation test. 
• 
Explain to your customer the proper operation 
procedures as described in the user manual. 
• 
If the indoor unit does not operate, check to see that 
the connections are correct. 
 CAUTION 
• 
Trial run should be conducted on one unit at a time 
to check for incorrect wiring of connecting cord. 
After unscrew the 
bond, put the 
display panel cord 
and fix again with 
screw 
Display panel 
cord 
NORMAL 
HIGH 
LOW 
Connecting Cable 
Connection Cord 
Binder 
PVC tube 
Electric box 
Aluminum tape (large)
 
CN9 
CN1101