Geovision GV-MOUNT101 User Manual

Page of 187
 
Installing the Fixed IP Dome 
 
93 
2.  Assemble the mounting bracket (GV-Mount400 / GV-Mount410, No. 1) and the junction 
box (GV-Mount203, No. 1) from the backside using 25 mm M8 screws (GV-Mount400 / 
GV-Mount410, No. 4), plain washer (GV-Mount400 / GV-Mount410, No. 5) and split 
washers (GV-Mount400 / GV-Mount410, No. 6). 
 
 
 
 
 
Backside View 
3.  Secure the mounting bracket to the pole using 3 steel straps (GV-Mount400 / GV-
Mount410, No. 2). Rotate the screw on the strap to adjust its size. Face the conduit exit 
downward. 
             
 
4.  Assemble the corrugated tube connector (GV-Mount203, No. 4) with the self-prepared 
corrugated tube. 
A.  Dismantle the supplied corrugated tube connector. You should have 4 parts. 
A B
C
D
 
B.  Slide part A and part B to the self-prepared corrugated tube. 
A+B
C
D
 
C.  Screw part C to the tube.