Gw Instek GPT-9802 Insulation measuring device, GPT-9802 User Manual

Product codes
GPT-9802
Page of 156
 
 
GPT-9000 Series User Manual 
64
 
IR PASS Timing 
Discharge time 
Output V
time
Initial time 
(100ms)
START
TEST
PASS
RAMP
TEST TIME
 
GB PASS Timing 
Output I
time
START
TEST
PASS
0.5s 
Initial time 
(100ms)
Total Test Time
 
FAIL Judgment 
1.  When the test is judged as FAIL, 
FAIL will be displayed, the buzzer 
will sound and the FAIL indicator 
will be lit red. 
As soon as a test is judged FAIL, 
power is cut from the terminals. 
FAIL
 
 
I R  
G B  
 
A CW
D CW
 
 
         
 
 
F R E Q =  
0 H z  
6
0
   
100
k
 
V
 
       
R
A C
 
=
F F
O
I
A
F
 
                         
M
T I
E
= 0 0 1 . 0 S
R
0 0 m A
E
R F
=
#
0 .
0
1 . 0 0 m A
I
H
E
S
= 0
T
0 0 . 1 S
0
A M P
=
R
 
2
M A U
N
0 0
_
2
M A N U = * * * - 0 0
 
 
L
m A
01 37
 
 
 
2.  The FAIL judgment will be held on 
the display until the STOP button 
is pressed. Pressing the STOP 
button twice will return the tester 
to the READY status.   
STOP