Gw Instek GPT-9802 Insulation measuring device, GPT-9802 User Manual
Product codes
GPT-9802
GPT-9000 Series User Manual
64
IR PASS Timing
Discharge time
Output V
time
Initial time
(100ms)
(100ms)
START
TEST
PASS
TEST
PASS
RAMP
TEST TIME
GB PASS Timing
Output I
time
START
TEST
PASS
TEST
PASS
0.5s
Initial time
(100ms)
(100ms)
Total Test Time
FAIL Judgment
1. When the test is judged as FAIL,
FAIL will be displayed, the buzzer
will sound and the FAIL indicator
will be lit red.
will sound and the FAIL indicator
will be lit red.
As soon as a test is judged FAIL,
power is cut from the terminals.
power is cut from the terminals.
FAIL
I R
G B
A CW
D CW
F R E Q =
0 H z
6
0
100
k
V
R
A C
=
F F
O
I
A
F
M
T I
E
= 0 0 1 . 0 S
R
0 0 m A
E
R F
=
#
0 .
0
1 . 0 0 m A
I
H
E
S
= 0
T
0 0 . 1 S
0
A M P
=
R
2
M A U
N
0 0
_
2
M A N U = * * * - 0 0
L
m A
01 37
2. The FAIL judgment will be held on
the display until the STOP button
is pressed. Pressing the STOP
button twice will return the tester
to the READY status.
is pressed. Pressing the STOP
button twice will return the tester
to the READY status.
STOP