TP-LINK CPE510 User Manual

Page of 77
Pharos Control User Guide
 
Step 10. On the following screen, click Finish to complete the installation and launch the Pharos 
Control Server. 
 
Figure 1-10 Complete Installation   
1.3  Before Login 
Ensure the server is reachable from the client before login. If the server is behind an NAT gateway, 
please refer to the gateway’s reference guide to open the corresponding port as configured in 
Figure 1-7 if you want to access the Pharos Control Server from the Internet.