04/2003 
Installation 
SINAMICS G110    Operating Instructions 
 
6SL3298-0AA11-0BP0 
17
 
2 Installation 
WARNINGS 
 
Work on the device/system by unqualified personnel or failure to comply with 
warnings can result in severe personal injury or serious damage to material. 
Only suitably qualified personnel trained in the setup, installation, 
commissioning and operation of the product should carry out work on the 
device/system. 
 
Only permanently-wired input power connections are allowed. This equipment 
must be grounded (IEC 536 Class 1, NEC and other applicable standards). 
 
If a Residual Current-operated protective Device (RCD) is to be used, it must be 
an RCD type B. 
 
The mains input, DC and motor terminals, can carry dangerous voltages even if 
the inverter is inoperative; wait 5 minutes to allow the unit to discharge after 
switching off before carrying out any installation work. 
 
This equipment must not be used as an ‘emergency stop mechanism’ (see EN 
60204, 9.2.5.4) 
 
The minimum size of the earth-bonding conductor must be equal to or greater 
than the cross-section of the power supply cables. 
 
Safety regulations must not be compromised when installing inverters! 
CAUTION 
The connection of power, motor and control cables to the inverter must be carried 
out as shown in Figure 2-8 on page 28, to prevent inductive and capacitive 
interference from affecting the correct functioning of the inverter. 
2.1 General 
Installation after a Period of Storage 
Following a prolonged period of storage, you must reform the capacitors in the 
inverter. It is important that the time of storage is calculated from the time of 
manufacture and not the time of delivery. 
The requirements are shown below. 
 
Figure 2-1 
Reforming Capacitors After a Period of Storage