Phoenix Contact 2701030 NLC-050-024D-06I-04QTN-00A nanoLine Base Unit 24ßV/DC / NPN 2701030 Data Sheet
Product codes
2701030
Getting Started and Tutorial
2373_en_B
PHOENIX CONTACT
2-47
2.8.3
Monitoring the Project
Once nanoLC has a project downloaded to it, nanoNavigator can start, stop, and monitor its
execution by viewing flow charts and data items. nanoNavigator can even modify data
items, inputs, and outputs.
To monitor the project, follow these steps:
1.
Select the “nanoLC... Run nanoLC!” menu.
2.
Select the “nanoLC... Monitor” menu. This displays the “nanoLC Monitor” window (see
Figure 2-35). For more information about this window and how to use it, see “nanoLC
Figure 2-35
The “nanoLC Monitor... Flow Charts” tab
The “nanoLC Monitor... Flow Charts” tab displays the status of all data items in the current
flow chart. For more information, see “Flow Charts Tab” on page 7-4.
Select any block in the flow chart to display data item values in that block. This also brings
the “nanoLC Monitor... Blocks” tab to the front. For more information, see “Blocks Tab” on
Execution Tracking
Use nanoNavigator to view the execution track of any flow chart in the project. In Monitor
mode, open flow charts automatically provide execution tracking. Execution tracking is the
display of color-coded blocks to indicate whether or not blocks were recently executed. The
color coding is:
–
Green: Always executed on every scan
–
Yellow: Sometimes executed
When attempting to monitor a stopped project, nanoNavigator provides the opportunity to
automatically begin execution on the nanoLC.