Burnham MPC (Multi-Pass Commercial) Brochure

Page of 4
3
PA
G
E
SBC 
INTEGRATED BOILER CONTROL SYSTEM
The Burnham Commercial SBC is a complete boiler monitoring and  
automation system. Available as an option, this exclusive feature was 
designed and developed by Burnham Commercial engineers and is 
available ONLY on Burnham Commercial products.
 Designed to maximize system efficiency and minimize energy usage
• Easily connected to building management systems
 Proven control platform
 Fail-safe design ensures boiler operation
POWER
LOCKOUT
MENU
ENTER
SBC
SBC Exclusives
Advanced Adaptability
  Easily integrated into existing or new building  
management systems
  Simplified connections available to most building management  
systems through Modbus® or standard 0-10 volt signals
  Uses sophisticated PID control logic for complete boiler  
system control
  Performs control functions for both single and multiple boilers
Peer-To-Peer Network 
  Includes lead-lag sequencer for up to eight (8) fully  
modulating boilers 
  Capable of auto rotation, outdoor reset and  
peer-to-peer communication 
  “Plug and play” communication by simply connecting a  
RJ11 telephone line between boilers 
  Provides precise boiler coordination by sequencing boilers 
based on both remote system water temperature and boiler 
modulation rate
  Boilers are modulated in “unison”, all at the same firing rate to 
ensure even heat distribution
Fail-Safe System Operations
  Allows continued boiler operation in the event of selected 
sensor failure or building management system failure
Boiler Monitoring & Diagnostic Displays
 Two-line by sixteen (16) character LCD display
  Automatically presents boiler sequence, alarm, hold and  
lockout messages  
  Diagnostic menu displays the last 10 alarm messages and the  
boiler return temperature alarm history
Modulation Rate & On/Off Modes
  Controls the boiler modulation and on/off output based  
on the supply water temperature and an operator  
adjusted setpoint 
  Can respond to remote system water, outside air 
temperatures, Domestic Hot Water Priority (DHWP)  
or Energy Management Systems (EMS)
Outdoor Air Temperature Reset
  Saves fuel by reducing the supply temperature of a heating 
boiler as the outside air temperature increases
Warm Weather Shutdown (WWSD)
•  Prevents the boiler, boiler pump and/or the system pump 
from starting during warm weather
Domestic Hot Water Priority (DHWP)
  Continuous supply of hot water, even during warmer months
System Control Outputs
  Fully integrated automation of mixing valves, boiler pumps,  
system pumps and standby system pumps 
  Controls are field selectable through simple yes/no  
menu selections
Optional Burnham Commercial
Universal Gateway
•   Can be connected to a building’s Energy Management  
System (EMS) using simple menu selections and wiring  
a 4-20mA input
•  Connects to EMS using modbus protocol
•  Optional EMS Gateway to BacNet or LonWorks
•   Allows EMS controls to adjust either the SBC™ central  
heating setpoint or the firing rate
Only available from Burnham Commercial!