HP Performance Optimized Data Center (POD) 40c Quick Setup Guide

Page of 41
 
Site requirements  16 
A 1N electrical configuration can be achieved by providing all required electrical feeders from a common 
power source and from common switchboards, and transformers. 
A 2N electrical configuration can be achieved by feeding parallel power paths from independent power 
sources, switchboards, and transformers. 
  
 
IMPORTANT: 
The required neutral must be provided as part of the 800 A 415VAC Y direct 
connection to the HP POD 40c G2. 
  
  
 
IMPORTANT:
  All 3-Phase Wye feeders for the HP POD 40c G2 require that the neutrals and the 
equipment grounding conductors remain isolated. Bonding of the two conductors is allowed at 
the power source only. 
  
 
Transformers and switchboards 
The input power for the critical IT loads requires a source of 380-415V, 3-Phase Wye power. To achieve this 
input power, a custom transformer might be required if it does not already exist at the source. In addition to 
the overall loading and KVA size, you must consider the Harmonic Content of the installation when 
specifying the K-Factor of the transformer. Alternatively, you can use Harmonic Mitigating Transformers to 
passively cancel the harmonics generated by the IT Equipment. 
HP offers several power solutions that include automatic transfer switching, UPS backup, transformers and 
output distribution switchboards to supply your power needs. 
On-site connections might include: 
 
Main facility power to the primary side of the transformer 
 
Transformer to the switchboard 
For connection information, see the HP Site Preparation Drawing Package (on page 
).