HP Performance Optimized Data Center (POD) 40c Service Manual

Page of 82
 
Removal and replacement procedures  27 
Replacing the ECS touchscreen 
1. 
Replace the ESC touchscreen through the front of the door (1), and then secure the ECS touchscreen to 
the back of the door with eight screws (2). 
 
2. 
Connect the cables to the back of the ECS touchscreen. 
 
EPO button 
There are two EPO buttons, one by each personnel access door in the HP POD 40c G2. 
 
You need a Phillips-head screwdriver for installation.