Periodic maintenance  65 
Drains 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Drains 
Visually check drains for blockage  Monthly 
Certified facilities 
personnel 
— 
Functionally test drains 
Quarterly 
Certified facilities 
personnel 
 
 
ECS 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Full system functional check 
Operational check of all system 
components 
Quarterly 
Certified facilities 
personnel 
— 
Check and clear alarm log 
Quarterly 
Certified facilities 
personnel 
— 
Inspect and test ECS battery 
backup system 
Bi-annually 
Certified facilities 
personnel 
 
 
Electrical 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Electrical connections (might 
require a scheduled shutdown) 
Infrared inspections of all power 
connections under normal 
customer load including 
transformer, switchboard, and 
electrical panels (Periodic thermal 
scans of all electrical connections 
can reduce issues caused by 
connections becoming loose due 
to operational vibrations over 
time.) 
Annually 
Licensed electrician 
— 
Busway drop box visual inspection 
and torque test of connections. 
Retighten as necessary and verify 
adequate distance between 
connection lugs and drop box 
grounded steel. 
Annually 
Licensed electrician 
— 
Busway visual inspection of 
busway section and connector 
interconnects. Retighten as 
necessary. 
Annually 
Licensed electrician 
— 
Busway drop box connections and 
locking bolt. Visual inspection and 
torque test of locking bolt. Visually 
inspect drop box load cable and 
cord-cap. 
Annually 
Licensed electrician 
— 
Visually inspect drop box breaker 
and torque test breaker lug 
connections. Mechanically 
exercise drop box breaker. 
Annually 
Licensed electrician