HP Performance Optimized Data Center (POD) 40c Service Manual

Page of 82
 
Periodic maintenance  68 
HP POD 40c G2 structure 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Complete structure 
Visually inspect the structural 
integrity. 
Annually 
Certified facilities 
personnel 
— 
Inspect the door operation and 
inspect the door gaskets for water 
and air leaks. 
Annually 
Certified facilities 
personnel 
— 
Visually inspect the paint. Perform 
prep and touch-up as necessary. 
Annually 
Certified facilities 
personnel 
 
 
Life safety 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
EPO system 
EPO functional test with manual 
and automatic shutdown. (Verify 
all shunt-trips on all panels trip.) 
Annually 
Licensed EPO safety 
contractor 
— 
EPO alarms 
Annually 
Licensed EPO safety 
contractor 
— 
EPO bypass keyed switch 
(functional test) 
Annually 
Licensed EPO safety 
contractor 
— 
EPO bypass switch located at 
each personnel door. (Functional 
test. Verify system time-out reset 
when switch is activated.) 
Annually 
Licensed EPO safety 
contractor 
— 
EPO status light. (Verify operation 
in different modes. Replace lamps 
as necessary.) 
Annually 
Licensed EPO safety 
contractor 
— 
Exit lights. (Verify exit lights are 
visible when all lighting is off and 
POD doors are closed.) 
Bi-annually 
Certified facilities 
personnel 
— 
Tritium exit signs (Visual 
inspection) 
Bi-annually 
Certified facilities 
personnel 
— 
Personnel door emergency egress 
panic bars. (Visual and 
operational inspection.) 
Bi-annually 
Certified facilities 
personnel 
 
 
Security 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
System functional test 
Visual inspection and operational 
test of door access contact 
switches 
Annually 
Certified facilities 
personnel 
— 
Visual inspection and operational 
test of door access card readers, 
electric strikes, and door release 
switches at each personnel door 
and/or in each personnel door 
panic bar 
Annually 
Certified facilities 
personnel