SharkRack CM-74 User Manual

Page of 3
CM-74 Vertical Cable Management Installation Instructions
CM-74
04/30/03 Rev 1.0
Page 2 of 3
Installation Instructions
Step
Detail
The CM-74 is a vertical cable management 
rail that secures vertically run cables. The 
CM-74 is mounted at the rear of the 
cabinet on either side.
1. Choose a location for the vertical cable 
management rail.
Note: The vertical cable management 
rail can be installed on either side of the 
cabinet.
2. Install the trapezoidal spring nut into the 
cabinet frame. Fit the spring nut into the 
cabinet slotted part of the cabinet 
extrusion with the spring facing the 
opening. Turn the spring nut 90 degrees 
to secure it into place.(See Figure A)
3. Place the mounting hole of the vertical 
cable management rail over the spring 
nut. 
4. Secure the vertical cable management 
rail to the cabinet frame using (2) 1/4-20 
cap screws. Do not tighten the screws 
until the final placement is made.
5. The rail can be moved forward or 
backward before the mounting screws 
are tightened. Once the rail is in 
positionm tighten the (2) 1/4-20 cap 
screws.