GE General Electric Oxygen Equipment PT878 User Manual

Page of 297
Chapter 8. Servicing the PT878
200
Transport® Model PT878 Portable Liquid Flowmeter User’s Manual
8.12.2b Installing New Software (cont.)
2.
The meter asks for confirmation. Repeat the options shown in Step 1 
above. The screen on both the PC and the PT878 now appears similar to 
Figure 134 below.
Figure 134: Flash Reloading Window
3.
The meter now asks if you wish to reload the flash memory via the 
infrared communications port. 
Press 
[F3]
 (Yes) (or C on the PC keyboard) to begin reloading via 
IrCOMM, or
Press 
[F2]
 (No) (or ESC on the keyboard) to stop the reloading 
procedure.
4.
Be sure the infrared sensor on the meter has a clear path to the infrared 
adapter on the PC, and return to the PC Hyperterminal program.
GE Sensing PCI Loader 
[HW Rev3+]
Reload Flash via Infrared (Yes/No)?
Backup Battery: OK
Firmware CRC: Valid
IrOBEX          No           IrCOMM
v3.0 2/26/03