BENDIX SD-08-2416 User Manual

Page of 6
5
2. Connect the supply and control lines to the Trailer
System-Guard
 air dryer making sure to keep the control
and supply circuits separate as shown.  Do not switch
lines end to end.  All ports are identified as indicated in
figures 1 and 2.
3.   Affix the Alcohol Warning Decal to the trailer bulkhead.
Before applying the decal remove all oil and road
contaminants from the mounting location with a good
cleaning solvent.
OPERATIONAL TEST
Build the air system to governor cutout.  Shut off the engine.
Using a soap solution, check all lines and fittings leading
to and from the Trailer System-Guard
 air dryer for leakage
and integrity.  Repair any excessive leaks - exceeding a 1"
bubble in 5 seconds - before restoring vehicle to service.
Supply
Trailer
System-Guard
 Air
Dryer
FIGURE 4 -TRAILER SYSTEM-GUARD
 AIR DRYER PLACEMENT
"12 IN
SUP"
"11 IN
CONT"
R-12
 Relay
Valve
Spring
Brake
Valve
Reservoir
"22 OUT
SUP"
"21 OUT
CONT"
Spring
Brake
If the trailer is equipped with an R-12P
valve, the trailer systems guard must be
mounted upstream of the R-12P
 valve.