RAID Subsystem DVA-12T | Installation Manual
Subsystem Maintenance and Upgrading | en 37 
Bosch Security Systems
F.01U.027.798 | V1 | 2006.06
Fig. 6.5
Install the BBU Module
3.
Secure the BBU module to the enclosure. Tighten the two (2) retention screws as shown 
above on the back of the BBU module.
4.
Once the new BBU module is correctly installed into the subsystem, the LED should start 
flashing, indicates the BBU is being charged. When the BBU is fully charged, the LED will 
light amber constantly.
6.5
Replacing a Failed PSU Module
6.5.1
PSU Module Overview
Two redundant PSU modules: The RAID subsystem comes with two fully redundant, hot-
swappable PSU modules. These modules are located at the rear of the subsystem.
Immediate replacement: When a PSU fails, it should ideally be replaced immediately. Do 
not remove the PSU module unless a replacement is readily available. Removing a PSU 
without a replacement will cause severe disruptions to the internal airflow and the sub-
system will overheat, possibly causing irreparable damage to some of the subsystem 
components.
6.5.2
Replacing the PSU Module
To replace a PSU, please follow these steps:
1.
Turn off the PSU. The power switch is located at the rear of the PSU. (See Figure 6.6)
i
NOTICE! 
The life expectancy of a BBU is approximately 500 cycles. Follow the procedures above to 
replace an old BBU with a new BBU in order to maintain fault-tolerant subsystem functional-
ities. We recommend replacing the BBU yearly.
i
NOTICE! 
Although the subsystem can operate using single PSU module, it is not advisable to run the 
RAID subsystem with a single PSU module for an extended period of time.
i
NOTICE! 
Before you insert a new PSU, be sure that it has the same warning label on its extraction lever 
as that shown on the lever of a remaining PSU. Double-check to avoid mixing a similar yet dif-
ferent PSU of another series.