Baxi Potterton WH46 User Manual

Page of 36
3
926.772.1 - GB/IE
INSTRUCTIONS PERTAINING TO THE USER
This boiler is designed to heat water at a lower than boiling temperature at atmospheric pressure. The boiler 
must be connected to a central heating system and/or to a domestic hot water supply system in compliance 
with its performances and output power.
The boiler must be installed by a Qualified Service Engineer ensuring that the following operations are carried 
out:
a) Careful checking that the boiler is fit for operation with the type of gas available. For more details see the 
notice on the packaging and the label on the appliance itself.
b) Careful checking that the flue terminal draft is appropriate; that the terminal is not obstructed and that no 
other appliance exhaust gases are expelled through the same flue duct, unless the flue is especially desi-
gned to collect the exhaust gas coming from more than one appliance, in conformity with the standards 
and regulations in force.
c) Careful checking that, in case the flue has been connected to pre-existing flue ducts, thorough cleaning 
has been carried out in that residual combustion products may come off during operation of the boiler and 
obstruct the flue duct.
d)  To ensure correct operation of the appliance and avoid invalidating the warranty, observe the following 
precautions:
1. 
Hot water circuit:
 
If the water hardness is greater than 20 °F (1 °F = 10 mg calcium carbonate per litre of water) a 
polyphosphate or comparable treatment must be used in response to current regulations.
2. 
Heating circuit
2.1.
 New  system
 
Before proceeding with installation of the boiler, the system must be cleaned and flushed out thoroughly 
to eliminate residual thread-cutting swarf, solder and solvents if any, using suitable proprietary 
products.
 
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non 
alkaline. The recommended products for cleaning are:
 
SENTINEL X300 or X400 and FERNOX heating circuit restore. The use of this product must be strictly 
in accordance with the maker’s directions. Finally the system must be dosed with a suitable inhibitor 
at 1% system volume.
2.2.
 Existing system
 
Before proceeding with installation of the boiler, the system must be cleaned and flushed out to remove 
sludge and contaminants, using suitable proprietary products as described in section 2.1.
 
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non-
alkaline such as SENTINEL X100 and FERNOX heating circuit protective.
 
Remember that the presence of foreign matter in the heating system can adversely affect the operation 
of the boiler (e.g. overheating, noisy operation, or failure of the heat exchanger may occur).
Failure to observe the above will render the warranty null and void
.
1. INSTRUCTIONS PRIOR TO INSTALLATION
Initial lighting of the boiler must be carried out by a qualified service engineer. Ensure the following operations 
are carried out:
a)  Compliance of boiler parameters with (electricity, water, gas) supply systems settings.
b)  Compliance of installation with the standards and regulations in force.
c)  Appropriate connection to the power supply and earthing of the appliance.
Failure to observe the above will render the 
warranty
 null and void.
Prior to commissioning remove the protective plastic coating from the unit. Do not use any tools or abrasive 
detergents as you may damage the painted surfaces.
2. INSTRUCTIONS PRIOR TO COMMISSIONING