Bosch Appliances Home Security System 8500 User Manual

Page of 104
EN | 16
Bosch Security Systems | December 13, 2005
7
Installation Procedure
7.1
Main CPU Bay Installation
Before discarding the shipping cartons, verify that the various pieces of equipment 
have no evidence of carrier damage.
CAUTION
 Do not apply power to the equipment until instructed to do so.
1.
Remove the front panel of the main CPU bay by loosening the four (4) corner 
fasteners.
2.
Install the power supply in far right position of the main CPU bay insuring 
proper alignment and seating of the module into the rear mating connector. Ver-
ify that the power supply ON/OFF switch is in the OFF position.
3.
Install the four (4) screws and star washers (supplied) on the rear panel of the 
bay(s) surrounding the power supply line cord to fasten the power supply 
securely in place.
CAUTION
If the Allegiant card cage is to be transported, the main power supply should be 
removed to prevent possible damage to the bay's internal parts.
4.
If the bay(s) are to be installed into a standard 19-inch EIA rack, remove the 
four (4) rubber bumper foot pads found on the bottom of the bay before install-
ing the unit in the rack. Four (4) holes are provided for mounting the bay(s) in 
the rack.
7.2
Video Input Modules
Termination switches on the Video Input Modules (VIM) must be set to the correct 
position prior to installation. If necessary, see Section 7.6 “Termination Practices,” on 
page 18 prior to actually installing the VIM on this system.
The appropriate number of VIMs should be installed in the main bay starting with 
the left most slot. If less than full capacity is being used, the modules should be 
inserted in a left-to-right manner so that the lower camera numbers are used first.
Figure 3: Typical Video Input Module Insertion
The VIMs are identical and are interchangeable within the designated VIM slots 
without having to make any changes to the module.