Sierra Monitor Corporation IZS30 SERIES User Manual

Page of 26

4. Installation 
 
4-1. Installation of Ionizer body   
Investigate the places where static problem occurs, or process and parts which generate ESD 
(Electro static discharge), and carefully consider the required conditions to ensure appropriate 
static charge elimination before installation. 
 
Operating distance and static charge elimination time: See [1. installation distance and 
static charge elimination time of 6-1.Static charge elimination characteristics 
(reference) ]. 
Static charge elimination area: See [See 2. Static charge elimination area of 6.1 Static 
charge elimination characteristics (reference)]. 
 
1.  Mount end brackets on both sides of the ionizer body with the attached M4 threads. 
Recommended tightening torque for M4 thread: 0.75Nm 
 
 
2.  Mount intermediate brackets on the ionizer body at regular interval.   

Note

No intermediate bracket is attached to IZS30-300B (SB), IZS30-780B (SB)). 
 
A.  Tap M5 thread on the brackets mounting positions at the installation side, and fix the ionizer 
body and brackets with M5 threads. 
 
































 
 
End bracket   
Attached M4 threads 
Intermediate bracket 
M5 tap   
M5 threads