Sigma IB850 User Manual

Page of 25
 
G8860 _4 Installation Manual NZ 
 
25
 
28.0  Installation Check List:   
 
 
 
 
 
 
 
Ensure there is adequate ventilation in the cavity.   
 
 
 
Ensure the spark electrodes are correctly positioned. 
 
 
 
Operating pressure checked with heater running on full (all 
burners operating) and all other gas appliances in the house 
switched on.   
 
 
 
 
 
 
 
 
 
 
Flue Draw checked, 5 minutes after start up.   
 
 
 
 
Logs 
in 
correct 
position. 
        
 
Coals spread along front burner. 
 
 
 
 
 
 
 
Heater run on high for 60 minutes with house doors and 
windows open to clear smell of paint and oils initial burn. 
 
 
Hearth and mantle clearances comply with these instructions. 
 
No combustible materials any closer to heater than these 
instructions allow.   
 
 
 
 
 
 
 
 
 
10  Heater fixed to wall and floor.   
 
 
 
 
 
 
 
11  Leak test all joints and pressure test points. Soapy water drop 
 test 
done 
 
on 
pipe 
work. 
     ________ 
 
12  Wall mount cradle screwed to wall.  
 
 
 
 
 
 
13  House holder has been shown how to operate heater.   
 
 
14  Operator manual has been left out for house holder, installer 
 
has filled in their own details and heater serial number into 
 
warranty card.   
 
 
 
 
 
 
 
 
 
 
15  Ensure adequate access to power flue units.   
 
 
 
 
16  If using a Power flue unit, make sure the electrical tray is 
wired up correctly.   
 
 
 
 
 
 
 
 
 
17  Inform the customer that the fire may continue smelling for a 
while after installation depending on frequency & duration of 
 
use   
 
 
 
 
 
 
 
 
 
 
  
 
18  Given House Holder Plumbing Industry Commission 
 Compliance 
Certificate.______________________________ 
Tick here