Siemens TV Converter Box G120 User Manual

Page of 147
 
 
 
 
 
 
 
    
Automation and Drives - SCE 
 
 
 
 
T I A  Training Document
 
Page 134 of 147 
 Module  
 
     H01 
Issued: 02/2008 
  Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET 
Preface         Notes         Startup with PROFIBUS         Startup with PROFINET         Program Example 
 
6. 
CONTROL PROGRAM 'BUCKET ELEVATOR’ ON THE PROFIBUS DP/PROFINET 
6.1 
Assigning the Process Data  for the SINAMICS G120 
 
With the process data, the control words and the setpoints (PLC -> SINAMICS) 
or the status words and the actual values (SINAMICS – PLC) can be transferred. 
 
The structure of the process data  (PZD) area is the same in the sequence of its elements (words) 
for the two indicated interfaces by means of  PROFIBUS DP and PROFINET. 
 
 
Process Data 1 
Process Data 2 
Request message 
(SPS -> SINAMICS) 
Control word 
(STW) 
Main setpoint  
(HSW) 
Response message 
(SINAMICS -> SPS) 
Status word 
(ZSW) 
Main actual value 
(HIW) 
 
 
6.1.1 
The Control Word (STW) 
 
 
 
 
Bit No.