Siemens TV Converter Box G120 User Manual

Page of 147
 
 
 
 
 
 
 
    
Automation and Drives - SCE 
 
 
 
 
T I A  Training Document
 
Page 18 of 147 
 Module  
 
     H01 
Issued: 02/2008 
  Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET 
Preface         Notes         Startup with PROFIBUS         Startup with PROFINET         Program Example 
3.   In the Sizer on the left, the project tree is located with the structure of the drive project; on the 
right, ’Workflow’ shows you the steps required to set up the drive system.  
 
 
4.   Now, first click on ’Network’ to view the network data. By clicking on the button '
’, you get to 
the dialog for setting the voltage, the frequency, and the number of phases. (
→ Network → 
 
→ Voltage 400V → Frequency 50Hz → Number of phases 3 → OK)