Quantum Tool Storage 6-01658-02 User Manual

Page of 414
Chapter 4  Common StorNext Tasks
Scheduling StorNext Events
StorNext User’s Guide
57
• Full Backup: By default, a full backup is run once a week to back up 
the entire database, configuration files, and the file system metadata 
dump file.
• Partial Backup: By default, a partial backup is run on all other days 
of the week that the full backup is not run. This backup includes 
database journals, configuration files, and file system journal files.
• Rebuild Policy: This scheduled event rebuilds the internal candidate 
lists (for storing, truncation, and relocation) by scanning the file 
system for files that need to be stored.
Each of these events initially has a default schedule, but you can 
configure the schedules to suit your system needs.
Viewing a Schedule
4
The procedure for viewing an event's existing schedule is the same 
regardless of the event type.
1
From the StorNext Home Page, select Schedule Events from the 
Admin menu. The Feature Schedules screen appears.
2
Select an event type:
• Clean  Info
• Clean Versions
• Full  Backup
• Partial  Backup
• Rebuild Policy
3
Click Configure. The Feature Schedules screen displays the selected 
event type and any existing schedules.
4
Click Close when you are finished viewing the schedule. (You can 
also click Back to return to the previous screen.)
Note:
The Scheduler does not dynamically update when dates and 
times are changed significantly from the current setting. You 
must reboot the system for the Scheduler to pick up the 
changes.