Q-See QX628 Technical Manual

Page of 93
 
37
      Utilize holiday list maintenance tool bar to construction holiday 
It is need to set holiday’s name, holiday dates and holiday lengths. 
 
3.1.9 Leave style setting 
 
Click ‘leaving setting’ in down-drag menu, the following window 
pop up.   
 
 
Utilize the tool bar to add, delete, and modify leave style as well as 
utilize account rule to set leave record rule, not only set to control leave 
give up or count, but also set the symbol in record list. 
 
 
3.1.10 Attendance rule     
 
Select maintenance /setup menu, click ‘attendance rules,’ option, and 
this window will pop up