Motion Computing 002-15-0010 User Manual

Page of 26
Motion MCW with MediaWave Computer 
– Installation and Assembly Procedure 
 
ii 
Document No. 002-15-0010
 
 
Motion Proprietary & Confidential 
Copyright © 2009 Motion Computing, Inc. as an unpublished work 
 
 
Table of Contents 
REVISION HISTORY ................................................................................................................................................ I
 
TABLE OF CONTENTS ...........................................................................................................................................II
 
1.
 
BASE WITH POWER SUPPLY SHROUD INSTALLED ............................................................................. 1
 
1.1
 
R
EMOVE THE PLASTIC 
S
HROUD THAT COVERS THE POWER SUPPLY
 .................................................................. 1
 
2.
 
COLUMN ASSEMBLY ..................................................................................................................................... 1
 
2.1
 
L
AY BASE ON ITS BACK
 .................................................................................................................................... 2
 
2.2
 
P
OSITION COLUMN ABOVE BASE
 ....................................................................................................................... 2
 
2.3
 
I
NSERT BOLTS THROUGH THE BOTTOM OF THE CART INTO THE COLUMN
.
 
T
HREAD EACH BOLT BEFORE FULLY 
TIGHTENING ANY BOLT
.
  
T
IGHTEN ALL FOUR BOLTS
. ........................................................................................ 3
 
2.4
 
S
ET CART UPRIGHT
 ........................................................................................................................................... 3
 
2.5
 
R
EMOVE ONE SCREW AND LOOSEN THE OTHER SCREW OF THE COLUMN TOP PLATE
 ......................................... 4
 
2.6
 
I
NSERT DECORATIVE COVER IN THE BACK OF THE COLUMN CHANNEL GROVES
. ............................................... 4
 
2.7
 
S
LIDE DECORATIVE COVER DOWN TO WITHIN 
24
 INCHES OF THE BASE
 ............................................................. 4
 
2.8
 
R
OUTE CABLES BEHIND THE DECORATIVE COVER
 ............................................................................................ 5
 
2.9
 
S
LIDE DECORATIVE COVER TO THE BOTTOM OF THE COLUMN
 .......................................................................... 5
 
2.10
 
H
OLDING CABLE IN THE CHANNEL AND INSERT SECOND DECORATIVE COVER IN THE BACK COLUMN CHANNEL 
GROVES
 ............................................................................................................................................................ 5
 
2.11
 
S
LIDE THE DECORATIVE COVER DOWN SO IT TOUCHES THE FIRST COVER
 ......................................................... 6
 
3.
 
INSTALLING THE WORK SURFACE AND DRAWER ............................................................................. 6
 
3.1
 
R
EMOVE THE DRAWERS BY PRESSING THE PLASTIC RELEASE TABS ON THE INSIDE OF THE DRAWER GLIDE 
RAILS
................................................................................................................................................................ 6
 
3.2
 
N
OTE WHERE THE 
A
LLEN SET SCREWS ARE LOCATED
 ...................................................................................... 7
 
3.3
 
S
LIDE THE WORK SURFACE DRAWER ASSEMBLY MOUNTING BRACKET INTO THE ADJUSTABLE RAIL LOCATED 
ON THE FRONT COLUMN
 ................................................................................................................................... 7
 
3.4
 
S
LIDE THE WORK SURFACE DRAWER ASSEMBLY DOWN THE RAIL TO ABOUT 
2
 INCHES 
(4.4
 CM
)
 FROM THE 
BOTTOM OF THE RAIL
. ...................................................................................................................................... 7
 
3.5
 
T
IGHTEN THE SET SCREWS
................................................................................................................................ 8
 
3.6
 
F
ULLY TIGHTEN THE SET SCREWS
 ..................................................................................................................... 8
 
3.7
 
R
EINSTALL THE DRAWER BY SLIDING IT ONTO THE DRAWER RAILS
 .................................................................. 9
 
4.
 
ASSEMBLE THE CPU/MONITOR VESA MOUNT ASSEMBLY ............................................................ 10
 
4.1
 
A
TTACH METAL SPACERS TO THE FRONT 
CPU
 
VESA
 
M
OUNT PLATE CORNERS
 ............................................. 10
 
4.2
 
P
LACE NYLON SPACERS OVER THE 
M
ONITOR 
VESA
 
M
OUNT PLATE THREADED INSERTS WHERE ARROWS 
INDICATE
 ........................................................................................................................................................ 10
 
4.3
 
I
NSERT SCREWS THROUGH THE FRONT 
CPU
 
VESA
 
M
OUNT PLATE HOLE AND THROUGH THE NYLON SPACERS
,
 
THREADING THEM INTO THE 
M
ONITOR 
VESA
 
M
OUNT PLATE THREADED INSERTS
 ........................................ 11
 
4.4
 
A
TTACH THE 
F
LUSH 
T
ILTING 
VESA
 
M
OUNT BRACKET TO THE BACK 
CPU
 
VESA
 
M
OUNT PLATE
 ................ 11
 
4.5
 
P
LACE THE 
M
EDIA 
W
AVE 
C
OMPUTER ONTO THE FRONT 
CPU
 
VESA
 
M
OUNT PLATE
,
 EVENLY SPACED 
BETWEEN THE METAL SPACERS AND CONNECTORS FACING DOWN
 ................................................................. 11
 
4.6
 
A
TTACH THE BACK 
CPU
 
VESA
 
M
OUNT PLATE TO THE FRONT 
CPU
 
VESA
 
M
OUNT PLATE
,
 USING THE 
THREADED METAL SPACERS ATTACHED TO THE FRONT PLATE
........................................................................ 12
 
5.
 
INSTALL THE MONITOR/CPU MOUNT ASSEMBLY BY SLIDING THE FLUSH TILTING VESA 
MOUNT BRACKET INTO THE FRONT OF THE COLUMN RAIL ...................................................... 12
 
5.1
 
P
OSITION THE 
VESA
 
M
OUNT BRACKET ABOUT ONE INCH FROM THE TOP OF THE COLUMN RAIL AND SECURE 
BY TIGHTENING THE SET SCREWS
 ................................................................................................................... 13
 
6.
 
ASSEMBLE THE BATTERY GAUGE HOUSING ..................................................................................... 13