Minicom Advanced Systems SMARTRACK 116 IP User Manual

Page of 67
USER GUIDE 
5.1 Avoiding general rack mounting problems  
Elevated operating ambient temperature 
The operating ambient temperature of the rack environment may be greater than 
the room ambient when installing into a closed or multi-unit rack assembly. So 
install the equipment in an environment compatible with the maximum rated 
ambient temperature. 
Reduced airflow 
Install the equipment in a rack in such a way that the amount of airflow required 
for safe operation is not compromised. 
Mechanical loading 
Mount the equipment in the rack in such a way that a hazardous condition is not 
achieved due to uneven mechanical loading. 
Circuit overloading 
When connecting the equipment to the supply circuit, consider the effect that 
overloading of circuits might have on over-current protection and supply wiring.  
Reliable earthing of rack-mounted equipment should be maintained. Give attention 
to supply connections other than direct connections to the branch circuit (e.g. use of 
power strips). 
6. Connecting to a rack 
Note! For increased rack depth of 905 ~ 990mm, first change the bracket, see 
section  6.1 on page 11.  
Note! The illustrations below show the connections to one side of the SmartRack 
116 IP. The connections are the same for the other side. 
1.  Move the rail until two screws appear, see Figure 1. 
 
Figure 1 Exposing the 2 screws 
2.  Loosen slightly the 7 screws as shown below.